Field report: global newsroom intranet
Design and deployment of a global intranet for a news and broadcasting group operating 54 local stations across Europe and North America. The programme brought newsroom resources, syndicated material, staff access, PBX telephony and station support into a common operating environment.
February — Discovery and local operations
The group had grown through acquisition. Individual stations retained their own directories, news libraries and playout arrangements. Staff obtained central material through a mixture of email attachments, FTP accounts and telephone requests to the London syndication desk. A presenter covering two stations required two logins and, in some cases, two versions of the same script.
Most sites served small towns and their surrounding districts. In 38 markets the group owned the principal local radio station and the weekly newspaper. Eleven of those also had a local television service. Newsroom staff produced the radio bulletin, the newspaper’s website and the television headlines from the same desk. Overnight and at weekends, several stations ran without an editor physically present.
The specification required a single staff directory, a searchable editorial library, regional news feeds, rights information and a support console showing the condition of each station. A local cache would keep approved material available during a connection failure. The client also requested a central means of suspending compromised accounts and isolating an affected station from the corporate network.
The programme also replaced the acquired stations’ PBX systems with local IP handsets and centrally routed voice services. Internal extensions, listener lines and newsroom numbers would share the corporate network. The design called for an independent fallback line at each site, with existing numbers forwarded through the new service after acceptance. Local studio talkback and transmitter control remained separate.
June — Integration and acceptance
HAWD supplied an intranet on Windows Server 2003 and IIS, backed by SQL Server 2005. Directory integration provided staff access across the acquired businesses. Station gateways collected selected text, photographs and audio packages, then passed approved items to the existing newsroom and playout systems. The transmitters and local audio stores continued to operate independently of the corporate connection.
Acceptance covered a regional news package, an entertainment interview and a recorded weather bulletin. Editors checked that each arrived in the correct queue with its running order and usage information. A simulated loss of the WAN left the approved bulletin available locally. A separate access exercise suspended a test account and prevented it from opening the editorial console. Telephony acceptance included extension calls, a listener call transferred to a studio and a fallback call from the headquarters installation. The regional completion sheets recorded that handsets registered and published numbers rang at the correct desks.
The operations director signed off the intranet in July. Subsequent stations were added in regional batches. By late October all 54 sites were using the common directory, and 43 had enabled automatic pickup of central bulletin packages. HAWD provided a printed procedure for putting a studio into local operation during a central service interruption.
The intranet and common staff directory were in use at all 54 stations. Editorial distribution, account controls and the commissioned telephony services had passed acceptance. Automatic bulletin pickup was enabled at 43 sites. The client had signed off delivery and received the operating procedures.
30 October, 05:42 GMT — First station call
A producer at a coastal station in western Europe called the support desk after the overnight bulletin reported an unidentified object landing outside the town. The next item described vehicles approaching it and the loss of contact with an outside broadcast team. The producer had no assignment in the diary for either event. When she tried to remove the item, the console said her account had been suspended.
At 05:48 a North American affiliate reported the same account condition. Its presenter had heard a bulletin naming an industrial estate outside his own town. He could see the material on the playout screen but could not open the source record. Central operations applied the containment profile to that station as a precaution. The presenter’s call ended mid-sentence. Attempts to ring him back returned a network announcement.
06:10 — Regional isolation
Central operations initially treated the reports as an intrusion affecting more than one station. Local editors were attempting to delete centrally approved material, and the security console showed repeated access violations. The operations manager authorised isolation of the affected sites. Within twelve minutes 31 gateways had applied the containment profile.
The profile cut all external network traffic at the 31 stations, including the monitoring and remote-management connections. Corporate access and public internet service stopped completely. At the 18 sites whose telephone services used the new network, external calls also ceased. The London desk called the emergency numbers in its printed directory. Several rang into the same PBX under a different published number. At one station, a handset on a shelf labelled “BT BACKUP” displayed the same registration failure as the reception phone.
Local audio equipment continued feeding the transmitters. Already downloaded recordings remained available, and presenters could still open their microphones. Nothing from outside the disconnected stations could enter those systems through the network.
Local staff heard fictional reports of communications failing while their actual phones and internet connection failed around them. Three duty presenters recorded this as corroboration in their station logs. One instructed the next shift to remain at home and continued the bulletin himself.
06:32 — Public enquiries
A receptionist at a station still using its old telephone line reported callers asking which road remained open. A school caretaker wanted to know whether children should be sent home. The local television headlines and the newspaper website carried the same account as the radio bulletin. Residents who checked a second local source found confirmation.
A volunteer emergency coordinator opened a village hall after hearing that an exclusion area had been established nearby. His announcement over the local telephone tree was reported back to the station as independent evidence of an evacuation. Elsewhere, a presenter read a caller’s description of lights beyond the bypass alongside the central script. The lights were the headlamps of vehicles leaving town.
Police switchboards became congested with requests for evacuation routes. At two of the smaller stations, staff repeated the last bulletin when police asked where the information had originated. The bulletin described emergency services falling silent. The absence of a subsequent official announcement was treated on air as confirmation that contact had been lost.
07:05 — HAWD attendance and contact register
Two HAWD engineers attended the London operations centre. The station health screen remained green, but the timestamps had stopped advancing. The dashboard retained each station’s last reported state without expiring it when the connection disappeared. No gateway counters, acknowledgements or remote sessions were getting through. The operations desk started a paper register with separate columns for receiving a broadcast off air, reaching a person and obtaining control. None of the three columns could be inferred from the others.
Staff searched personnel records for private mobile numbers. Four calls reached presenters who went outside to obtain reception. A fifth reached a producer’s wife, who said he had called earlier to tell her to leave town. In several rural coverage areas the office line was the only dependable means of reaching the building. Calls to the local newspaper were answered by the same station staff.
Meanwhile, a school transport contractor cancelled its morning routes after consulting two group-owned stations. A care home began moving residents to a sister facility. Vehicles queued at filling stations and blocked an access road used by a responding ambulance. At a community hall, volunteers began taking the names of people whose families had not answered their phones.
07:24 — Programme source identified
An engineer played the headquarters copy of a package previously sent to an affected station and compared it with an off-air recording. Between simulated field reports, the script described large machines emerging from an impact site and disabling approaching vehicles. The entertainment editor identified it as the group’s forthcoming adaptation of The War of the Worlds. Regional versions used local place names and station presenters. The opening announcement identifying the production as drama was a separate continuity item and had not accompanied the reports into the news queue.
HAWD issued a correction through the intranet and asked central operations to reverse the isolation. Neither action reached the disconnected gateways. The containment setting had been applied locally, and the same setting blocked the connection through which a revised configuration would normally arrive. There was no surviving management channel. Remote recovery jobs remained queued without acknowledgement.
The voice carrier agreed to divert selected published numbers to mobile phones and a temporary London desk. That restored a destination for incoming calls. It did not reconnect the handsets inside the stations. The first diverted calls were from listeners asking why the station was now being answered in London.
08:10 — Local intervention
HAWD arranged visits by regional engineers, maintenance contractors and station keyholders. At one site a presenter read the shutdown instructions from a mobile phone held against a studio window. At another, the only key to the apparatus room was with the engineer whose home number had been disconnected after his retirement. The building manager attended with a locksmith.
The first station restored to the network downloaded the correction beneath its cached urgent bulletin. At the next scheduled break it repeated the fictional report, followed by an advertisement. The engineer stopped automatic playout and had the presenter read the correction live. London amended the recovery instructions to require a check of the local running order before restoring scheduled output.
By 08:46 six sites had corrected their broadcasts. Fourteen could be reached by some combination of mobile, carrier diversion or local attendance. The remaining stations retained their last green status on the monitoring screen, with no current data behind it. A district council began sending officers to the isolated sites after its own attempts to telephone them failed.
09:20 — Stations accepting the reports
Several presenters challenged the correction. They recognised the voice in the supplied report as that of a colleague and knew the roads being named. At one European station the duty editor had already told his family to leave. He asked London for evidence that the correction had come from an authorised person, then attempted to check the intranet staff directory with his suspended account.
The entertainment editor joined calls to explain the production. Where possible, she played the omitted introduction and read ahead in the script. One station accepted the explanation only after the actor playing its outside correspondent answered a call from his home. The station had announced his presumed death twice.
During these calls, a regional hospital postponed routine appointments, two municipal depots released staff to collect their families and a road collision closed one of the routes being recommended on air. Stations still broadcasting began incorporating those real closures into the fictional emergency. Each additional local announcement made the central correction harder for the next duty editor to accept.
10:35 — Blackwater Ridge affiliate
The most persistent holdout was a remote affiliate serving forestry settlements in northern Canada. Its building stood outside the main settlement, beyond reliable mobile coverage. It was the only local radio newsroom, operated the weekly newspaper’s website and supplied the community cable headlines. The station manager and two overnight staff had printed the urgent bulletin before their accounts were suspended.
Blackwater Ridge housed its studio, playout equipment and transmitter in the same building, with the aerial mast in the compound. There was no separate relay site at which the programme could be disconnected. The transmitter received audio directly from the studio and shared its UPS and standby generator. Reports from listeners established that it remained on air. HAWD had no network contact with the site and no remote means of changing its output.
When the phones stopped working, the manager concluded that the communications failures described in the report had reached the station. Staff moved filing cabinets against the entrance, blocked the service door and withdrew to the studio with firearms. They continued reading from the printout, supplementing it with reports that corporate contact had been lost. Residents arriving for information were told over the external loudspeaker to take cover.
At 10:35 the regional service desk confirmed that no broadcast engineer was available to attend. The station had no resident engineer and its former maintenance contractor had ceased trading. Calls to the remaining contractors produced no one able to reach the site during the incident. HAWD sent the equipment records to the local police and asked the station’s daytime editor to meet them there.
11:26 — Main estate restored
All affected stations except Blackwater Ridge had either cleared their schedules or suspended local output. Editors were instructed to repeat corrections in the same bulletin slots as the original material. Newspaper sites published notices and local television carried recorded explanations. Some evacuation traffic continued moving after the corrections because motorists had switched away from stations they could no longer receive.
HAWD’s engineers began comparing the source packages, directory exports and firewall changes while the contact desk remained staffed. The incident manager declined to close the outage on the basis of the central dashboard. Blackwater Ridge was still broadcasting and its external phones were still unavailable.
14:50 — Holdout station attendance
Police and the daytime editor attended Blackwater Ridge. The editor’s key released the outer lock but the entrance could not be moved against the barricade. Staff refused to clear it. Officers reported seeing weapons inside and withdrew the editor from the doorway. The station manager announced their arrival on air as an attempt to take control of the last independent local broadcaster.
The editor had brought the original programme booking and a photograph of the recording session. Staff would not admit him to inspect them. They maintained that the police were directly under alien control and were attending to silence the station. A familiar face or an ordinary police uniform was therefore insufficient evidence of human authority. A negotiator was requested, together with specialist armed units. The external phones remained disconnected. Initial exchanges took place through the building’s independent door intercom.
16:15 — Site power disconnected
At police request, the electricity supplier disconnected the mains supply to the site. The UPS carried the studio and transmitter through the interruption. The standby generator then started automatically and accepted the load. Monitoring at a neighbouring station recorded no break in the broadcast.
The fuel and generator installation lay within the secured compound. Police could not obtain safe access while the occupants remained armed, and there was still no engineer available to assist. HAWD confirmed from the drawings that cutting the incoming network circuit would have no effect on the local audio path. The network was already isolated.
Inside the studio, the manager described the mains failure as an attack on the station’s ability to warn the public. The successful generator start was announced as confirmation that emergency broadcasting could continue. The only receiver staff were consulting was the off-air monitor tuned to their own transmitter. Their phones, internet access and editorial accounts remained unavailable. They had no independent source against which to check the accumulating reports.
17:30 — Negotiator contact
The negotiator established intermittent contact through the intercom. The entertainment producer’s explanation was relayed from the police command vehicle, including lines from the script that had not yet been broadcast. The manager treated her advance knowledge as evidence that the aliens controlled the company as well as the police. He refused to leave the studio or allow either colleague outside to speak privately. The negotiator’s offer of protection was described on air as an attempt to obtain prisoners.
Police helicopters arrived to support the response. Their presence was audible on the open studio microphone. The manager reported aircraft circling the building and read the passage in the cached bulletin describing aerial surveillance. Listeners now heard actual rotor noise underneath a report that had begun as recorded drama.
The local authority asked residents to keep away from the station. Some listeners interpreted the road closure as the exclusion zone described earlier in the programme. Others approached the area to look for relatives or offer assistance. Police had to turn vehicles back while the station continued telling its audience that the surrounding roads were under hostile control.
19:05 — Armed confrontation
Specialist armed police units and armoured vehicles took up positions around the site. Shots were fired from inside the building and officers returned fire. The exchange damaged the frontage and a police vehicle. One officer received treatment for an injury. Police maintained the cordon and the negotiator continued attempts to obtain a surrender.
The station remained on air throughout the shootout. One staff member described the vehicles from a window while another kept the microphone open. The manager announced that the station was under direct attack. Gunfire, helicopter noise and shouted instructions were carried with the commentary. For the occupants, these events supplied immediate confirmation of the account they had been broadcasting since the early morning.
HAWD’s contact desk was now receiving updates from the police command team and a recording of the live transmission. Engineers could establish that the original automated package had ended. The current output was being produced by the staff themselves, using the printout and their interpretation of events outside. Removing the source files at headquarters could no longer change the programme.
23:40 — Continued transmission
The negotiator repeated the offer of medical assistance and asked the occupants to put down their weapons. The manager insisted that the original reports were authentic and demanded that the police withdraw before any discussion. Appeals from colleagues and family members were rejected as attempts to obtain access to the building.
The generator continued supplying the entire installation. Between live reports, staff replayed the localised drama segments. Each repetition was presented as earlier coverage of the same continuing emergency. Nearby services carried corrections, but those broadcasts did not reach the staff inside Blackwater Ridge. The group’s incident log recorded the station as transmitting continuously, without restored communications or editorial control.
31 October, 02:10 GMT — Police entry
Following the failure of further negotiations, police raided the station. Explosive booby traps at the doors detonated during entry. Further rooms had also been booby-trapped, and the operation was interrupted by additional explosions and the evacuation of injured officers. The building was subsequently treated as an explosives scene. The later police report attributed the devices to the barricaded staff.
The studio microphone carried the entry, explosions and the manager’s announcement that the building had been breached. A recorded bulletin then resumed. Officers reaching the studio found it empty. All three staff had left through an old cellar and a passage emerging outside the compound wall. Neither the cellar nor its external connection appeared on the premises drawings supplied to HAWD or passed to police.
02:34 — Vehicle seizure and aircraft loss
Outside the wall, the three staff hijacked an armoured police vehicle. The subsequent equipment inventory established that automatic weapons had been inside. The occupants used those weapons to fire at a low-flying police helicopter. The aircraft was struck and crashed nearby. Rescue personnel recovered the injured crew while police attempted to re-establish the location of the stolen vehicle.
The vehicle left the area across the surrounding countryside and disappeared into the wilderness. The armed entry had ended without any of the three staff being detained. Police extended the incident beyond the station and issued notices to remote settlements and outposts.
Inside Blackwater Ridge, the unattended recordings continued to transmit on generator power while specialist teams cleared access to the equipment. The broadcast was finally stopped at 04:18 GMT. Until that point, listeners heard repeated warnings of an attack on the station after the attack, explosions and helicopter crash had taken place.
31 October — Feed classification review
The entertainment library and the news exchange used separate numeric classifications. The entertainment system’s code for a dramatic bulletin matched the news gateway’s code for an urgent report. During the final regional rollout, HAWD had replaced two import jobs with a shared queue. The source-system field was omitted from the destination lookup.
The fictional reports consequently arrived as urgent news, already cleared for affiliate use. The continuity announcement remained in the entertainment queue because it had a different asset type. Localisation had been completed upstream, so each station received a convincing account of an event close to its own coverage area. Its website and television templates consumed the same misclassified records.
The sample entertainment interview used for acceptance had no equivalent urgent-news code. The test had also included its introduction within the same audio file. Neither condition represented the structure of the October production.
1 November — Account and network review
The directory job placed local editors in the correct group, but the gateway’s permission table still used the previous numeric role identifiers. An editor attempting to withdraw a protected central item was recorded as an unauthorised user. Three retries triggered account suspension. On-air staff trying to correct the first false reports therefore generated the security events that prompted central operations to isolate them.
The containment profile disabled all external data connections, including public internet access, the corporate tunnel, monitoring, remote administration and the paths used by the new PBX systems. Local audio wiring and the independent door intercom survived. In 18 affected stations, the nominal backup number had either been forwarded into the new PBX or its independent circuit had been ceased during consolidation. Headquarters had retained a separate fallback circuit, so its acceptance test had succeeded. The regional checks had proved that calls could be made with the network operating. They had not demonstrated a call during isolation.
The local cache, scheduler and transmitter were outside the containment profile. The system therefore removed external communications and editorial control while preserving the last approved material on air. At Blackwater Ridge, the integrated transmitter and common standby supply also prevented a mains disconnection from stopping the output. Once staff continued the reports manually, correcting the original feed fault would not have withdrawn their broadcasts.
2–22 November — Search operation
The manhunt continued for more than three weeks. Police conducted air and ground searches, contacted remote outposts and followed reported sightings across the northern district. The damaged armoured vehicle was eventually located abandoned. None of its occupants was found with it, and its recovery did not establish their subsequent whereabouts.
The broadcaster provided personnel records, voice recordings and the last known accounts of all three staff. Their colleagues recorded appeals explaining the original programme and asking them to make contact. There was no evidence that the missing staff had received any of those appeals. The station remained closed as a crime scene, and local news was supplied from another affiliate.
23 November — Two staff located
Two of the missing employees arrived on foot at a remote supply outpost. They were exhausted and in poor physical condition. They told the outpost operator that they had been living on wild game they had hunted and food foraged in the wilderness. Both initially asked that the police not be contacted, maintaining that the authorities had been taken over.
The operator obtained medical assistance. The two employees were transferred to hospital and subsequently admitted to a secure mental health unit. The station manager was not with them. They reported that he had separated from them after refusing their proposal to seek help. At their last contact, he still regarded the police, the broadcaster and the emergency services as being under direct alien control.
1 December — Hospital debrief
Following treatment and assessment, the two employees began cooperating fully with police and the broadcaster’s investigation. They were shown the complete drama, its omitted introduction and the distribution records. Their accounts covered the barricading of the station, the explosives, the escape through the cellar, the seizure of the police vehicle and the attack on the helicopter.
Both described the total loss of outside communications as the point at which the original reports ceased to seem questionable. They had interpreted police vehicles, helicopters, gunfire and attempts at negotiation within the same account of an alien takeover. Each new intervention had reinforced their belief that surrender would put them under alien control. Their statements were retained alongside the station recordings and police incident logs.
They provided all the information they could recall about the manager’s departure and his intended movements. Searches based on those accounts failed to locate him. Neither employee had heard from him since their separation.
15 December — Incident position
Twenty-seven stations broadcast some part of the production as news. Twelve local authorities recorded precautionary movements of residents, including organised departures from eight communities, and the client received claims for interrupted trading, damaged vehicles, emergency accommodation and the cost of returning care-home residents. Nine members of the public required hospital treatment following falls, traffic collisions and interruption of planned care. The Blackwater Ridge response added injuries to police officers and aircrew, damage from explosives, the loss of a helicopter and the seizure of an armoured vehicle. No station had an editorial record authorising an emergency announcement.
The group submitted recordings and schedules to the relevant broadcasting regulators and suspended automatic publication of central material pending review. Its insurers requested separate accounts of the initial classification error, the account suspensions, the decision to isolate the sites, the loss of telephone fallback and the continuation of broadcasts after corrections had been issued. The siege, escape and subsequent attacks remained under criminal investigation. HAWD referred the correspondence to its retained indemnity advisers.
The intranet remained available at group headquarters throughout the incident. The monthly availability report had treated the disconnected stations’ last reported status as current. At the client’s request, the report has been withdrawn.
The two recovered employees remain under clinical care and continue to cooperate with investigators. The Blackwater Ridge station manager has not been located. On the basis of their accounts, he is believed to remain in the wilderness, still convinced that the world has been taken over by aliens.
The false broadcasts have ended. Blackwater Ridge remains closed as a crime scene, with local news supplied by another affiliate. The incident caused injuries, property damage and the loss of a police helicopter. Two employees remain under clinical care; the station manager has not been located. Regulatory and criminal investigations continue. Claims correspondence has been referred to HAWD’s retained indemnity advisers.