Field report: chief executive handset migration
Onsite attendance at a client’s London office to move the chief executive’s contacts, calendar and photographs from a Nokia E71 to a newly purchased iPhone 3GS, including transfer of the mobile number, email configuration and handover.
Assignment record
| ATTENDANCE | 3 July 2009 |
|---|---|
| CLIENT | Events and brand experience agency / Clerkenwell, London |
| USER | Chief executive |
| OLD HANDSET | Nokia E71 / Vodafone / calendar and contacts held on the handset only |
| NEW HANDSET | Apple iPhone 3GS 32 GB / O2 |
| SCOPE | Number transfer / contacts, calendar and photographs / email account / car kit pairing / handover |
09:30 — Handset review
The engineer attended the client’s office by appointment and met the chief executive and the chief executive’s assistant. The new handset had been purchased the previous weekend and was still sealed. The old handset was in daily use and held 1,214 contacts, 3,870 calendar entries, 212 photographs on its memory card and the text message history.
The chief executive did not use a computer for diary management. The handset was the only copy of the calendar; the assistant maintained a separate paper diary for office appointments. Company email was provided through the hosted service managed by Half Assed Web Design and had been read on the old handset over IMAP.
09:50 — Number transfer and activation
The porting authorisation code had been obtained from Vodafone earlier in the week and submitted to O2. The number was due to move during the day. The engineer confirmed with the chief executive that the old handset would continue to receive calls until the port completed and that the new SIM would take over without further action.
The new handset required activation through iTunes before it could be used. The chief executive had no personal computer, so the engineer’s field laptop was used as the intermediate machine. The laptop had last been used on an assignment in Frankfurt the previous week. It was connected to the client’s guest wireless network, iTunes was updated to the current release and the handset was activated at 10:12.
10:20 — Export from the old handset
Nokia PC Suite was installed on the laptop and the E71 connected by USB cable. Contacts and calendar entries were synchronised into an empty Outlook profile created for the purpose. The synchronisation completed without errors and the Outlook item counts matched the handset: 1,214 contacts and 3,870 calendar entries.
The photographs were copied from the memory card to a folder on the laptop. The engineer advised that text messages could not be moved to the new handset by any supported method. The chief executive accepted this and asked that the old handset be kept in the office safe in case a message needed to be consulted.
10:55 — Synchronisation to the new handset
iTunes was configured to synchronise contacts and calendars from Outlook and photographs from the copied folder. The first synchronisation took eleven minutes. The handset then reported 1,214 contacts and the calendar was populated from 2006 to the furthest future entry in March 2010.
Six contacts had lost the second line of a postal address and were corrected by hand from the old handset. Two duplicate entries which had existed on the old handset were merged at the chief executive’s request. No calendar entries were reported as skipped.
11:30 — Verification with the user
The engineer and the chief executive compared the two handsets side by side. Ten contacts chosen by the chief executive were checked field by field. The appointments for the current day and the following Monday were compared and agreed in title, time and location. A recurring weekly management meeting was present with its full series.
The assistant checked the following week’s office appointments against the paper diary and found them in agreement. The chief executive confirmed that the calendar looked correct and that the photographs were present in the order expected.
11:50 — Email, car kit and handover
The company email account was added to the new handset and tested by sending and receiving. The handset was paired with the Bluetooth car kit in the chief executive’s vehicle in the basement car park, and a test call was made once the number port completed at 12:04.
The Outlook profile, the copied photographs and the PC Suite data were deleted from the laptop in the assistant’s presence. The old handset was powered off and placed in the office safe. The chief executive signed the attendance record at 12:15 and the engineer left the premises.
Contacts, calendar and photographs were present on the new handset with matching counts, the number had transferred, email and the car kit were working and the user had accepted the result. The job was closed as successfully completed.
13–16 July — Client event
The following sections are taken from the loss adjuster’s preliminary report and the range operator’s incident summary, copies of which were supplied to Half Assed Web Design on 22 July.
During the week of 13 July the client staged a four-day press launch for a vehicle manufacturer. The venue was a former airfield apron and perimeter track within the danger area of an artillery test and evaluation range in the east of England, operated by a contractor on behalf of the Ministry of Defence. The operator hires the apron for vehicle testing, filming and events between firing periods. The site licence issued to the client ran from 06:00 on Monday 13 July to 20:00 on Thursday 16 July and required the apron to be cleared by that time.
The client erected a temporary hospitality structure with a display floor, catering area and presentation equipment. The manufacturer supplied 34 pre-production cars for driving on the perimeter track and two engineering prototypes for static display.
9 July — Collection and removal schedule
On 9 July the vehicle transport contractor asked the client to confirm the collection date for the cars. The chief executive replied by text message from the new handset that the site was available until the 17th and that collection could take place from 10:00 that morning. The client’s logistics schedule was reissued the same afternoon with vehicle collection and removal of the structure on Friday 17 July. The reissued schedule was circulated to the manufacturer, the transport contractor and the structure supplier. It was not sent to the range operator.
The client’s event manager held a printed copy of the site licence showing the end date of 16 July. The event manager’s statement is that the revised dates were understood to have been agreed with the range by the chief executive’s office.
16 July — Close of the event
The final press session ended at 16:30. The cars were parked in four rows on the apron beside the structure and fitted with grey protective covers supplied by the manufacturer. The two prototypes remained on the display floor. The client’s staff and the manufacturer’s personnel left the site in two coaches, and the range gate log records the event contractor as off site at 19:20. The range provides its own perimeter security, and no overnight attendant had been arranged for the apron.
17 July, 06:10 — Range clearance
The range programme for 17 July was a proof firing of a production lot of 155 mm high-explosive ammunition, published in the usual way and scheduled to begin at 07:00. The target schedule specified three vehicle hulks positioned on the apron by the range’s target contractor on the evening of 16 July.
The target contractor had deferred the delivery of the hulks to the following week because of a vehicle fault. The amendment was recorded at the contractor’s depot and had not reached the firing-point documentation. At 06:10 the clearance patrol drove the perimeter track in mist, with visibility recorded as approximately 300 metres. The patrol observed vehicles on the apron, confirmed that no persons were present in the danger area and logged the targets as in position.
07:00 — Firing serial
Firing began at 07:02 from a gun position nine kilometres from the apron. The serial consisted of 48 rounds fired singly at intervals for the measurement of velocity, fall of shot and fuze function. The observation post, 1.5 kilometres from the apron, reported the first rounds as falling within the target area and thereafter recorded strikes and secondary fires among the targets. The mist had not fully cleared when firing started.
Thirty-one rounds had been fired by 09:38. Eleven had struck the parked vehicles directly and nine had struck the structure or the ground between the rows. Fuel fires spread along all four rows and into the structure, which collapsed at approximately 08:20.
09:40 — Cessation
At 09:40 the first of six vehicle transporters arrived at the range gate, followed by the structure supplier’s removal crew. The driver presented a collection order for 34 cars from the apron. The gate supervisor telephoned range control, which ordered a check fire at 09:43 and cancelled the remainder of the serial at 09:55.
The range fire service was unable to approach until the area had been declared safe from unexploded ordnance. Two rounds were unaccounted for and the apron was not released until 15:10. The fires had by then burned out. No person had been within the danger area during the firing and no injuries were reported.
17–24 July — Investigation
The range operator, the Ministry of Defence and the insurers of the client, the manufacturer and the range began separate enquiries. The loss adjuster’s preliminary report addresses three matters: why the apron was occupied after the licence had ended, why the occupation was not identified at handover of the site, and why the clearance patrol recorded the vehicles as targets.
On the first matter, the chief executive stated that the dates given to the transport contractor had been read from the handset calendar. The loss adjuster examined both handsets on 21 July. On the old handset, retrieved from the office safe, the entry for the site licence was an all-day entry from 13 to 16 July. On the new handset the same entry ran from 13 to 17 July. A comparison of the two calendars found that every all-day entry spanning more than one day ended one day later on the new handset than on the old. Timed appointments and single-day entries were identical on both.
The engineer’s laptop was supplied to the loss adjuster on 23 July. Its regional settings were found to be on Central European Summer Time, one hour ahead of the handsets. The preliminary report states that the displacement of multi-day entries is consistent with the handling of all-day entries by the synchronisation software when the intermediate computer and the handsets are set to different time zones. The checks carried out on 3 July had compared entry counts, timed appointments and a recurring series. No multi-day entry had been among the items compared.
On the second and third matters, the report notes that the licence document showed the correct end date and was available to the client’s staff on site, that the range’s handover procedure did not include an inspection of the apron on the evening the licence ended, and that the deferral of the target delivery had not been communicated to range control. The report does not apportion responsibility between the parties.
Damage assessment
All 34 pre-production cars and both engineering prototypes were destroyed. The hospitality structure, its contents and the hired presentation and catering equipment were destroyed. The apron surface was cratered over approximately a third of its area and has been withdrawn from hire.
The preliminary estimate of the loss is £14.2 million, of which the vehicles account for £11.9 million. The figure excludes the manufacturer’s claim for the two prototypes’ development value and for postponement of the model’s public launch, which had been scheduled for September, and excludes the cost of repeating the proof firing. The ammunition lot could not be accepted on the results of an incomplete serial.
The handset transfer of 3 July remains recorded as completed and accepted. Half Assed Web Design has notified its insurer and has been asked to preserve the attendance record and all files relating to the transfer. No further comment will be made while liability between the parties is under discussion.