Site v2.0Welcome to Half Assed Web Design on the World Wide Web
Internet solutions
for the new millennium.www.halfassedwebdesign.com
Web design • Domain names • E-commerce:: INFORMATION CENTRE ::
UNDER
CONSTRUCTION
More pages coming soon!
Best viewed at
800 × 600
with Internet Explorer 6.0
or Netscape Navigator.
HALF ASSED WEB DESIGN / CUSTOMER INFORMATION

Environmental Policy

Rev. 1.0Last updated: 22 March 2004

Half Assed Web Design is committed to making full use of the resources entrusted to it. Our datacentre combines previously used equipment, extended service life and on-site energy recovery to obtain continuing value from every machine we acquire.

Please note: Our datacentre is certified 100% recycled under our internal equipment-reuse standard. This status applies to the entire installed computing estate.

1. Recycled infrastructure

Every machine in our datacentre has previously served another organisation. Equipment released through office closures, system replacements and disposal programmes is returned to productive use. Purchasing decisions favour the greatest available quantity of retained equipment, helping us maintain our commitment to a fully recycled estate.

2. Extended operating life

Our oldest machine is 35 years old and remains in continuous service. Where a task could be performed by a single modern machine, clustering several dozen older machines allows us to perform the same task while preserving the useful life of existing assets. Equipment is assessed for replacement only when it can no longer be kept running.

3. Energy recovery

Failed hardware is burned on site to release energy which helps power the equipment remaining in service. This extends the contribution of each machine beyond its working life and reduces our requirement to purchase energy from outside the facility. Hardware transferred to this process is recorded as a recovered energy resource.

4. Residual materials

Incineration remains are disposed of through a deep soakaway within the datacentre grounds, allowing residual material to pass into the water table. This on-site arrangement eliminates collection journeys and returns processed material to the local environment. Our waste figures record only material removed from the premises, allowing us to maintain a low level of reported disposal.

5. Performance and certification

Environmental performance is measured by the proportion of reused equipment, years of service retained and quantity of failed hardware processed for energy recovery. Electricity consumption and emissions from burning equipment fall outside the scope of the reuse certificate. Certification is reviewed internally and renewed while the installed estate remains entirely second-hand.

Questions about this document?
Please contact the webmaster, quoting environment.htm in your message.
[ Back to top ][ Home ]~ End of document ~