Field report: Wuhan partnership discussions
A commercial and technical visit to a client’s Wuhan office in late December 2019 to explore a broader delivery partnership. The proposed arrangement combined Half Assed Web Design’s client relationships and project oversight with the Chinese partner’s engineering capacity and local operational support.
Visit brief
The discussions followed several months of remote contact about overlapping opportunities in web development, application maintenance and managed infrastructure. The client had an established technical team in Wuhan and was interested in a more predictable flow of overseas project work. Half Assed was looking for additional development capacity without immediately increasing its permanent London headcount.
Both parties considered an in-person meeting useful before drafting a formal commercial arrangement. Half Assed sent two personnel: a commercial lead responsible for pricing and client ownership, and a technical delivery lead responsible for integration, engineering standards and project acceptance.
| VISIT | 26–30 December 2019 |
|---|---|
| DESTINATION | Wuhan, China |
| ACCOMMODATION | Business hotel, Jianghan District |
| ATTENDING | Commercial lead and technical delivery lead |
| OBJECTIVE | Assess a potential joint delivery and referral arrangement |
| EXPECTED OUTPUT | Commercial assumptions, integration outline and proposed next steps |
26 December — Arrival
The two attendees arrived in Wuhan by plane and travelled to their hotel in Jianghan District. After checking in, they confirmed the following morning’s collection arrangements with the client and reviewed the presentation materials prepared in London.
The travel pack included an indicative project pipeline, anonymised examples of recent delivery budgets and a diagram of the tools used for requirements, source control, deployment and support. No production credentials or customer datasets were included. The technical lead checked that the demonstration applications could run locally without depending on access to the London office.
The team had dinner near the hotel and made minor changes to the order of the commercial presentation. The client had asked to begin with likely revenue and workload before considering the details of technical integration.
27 December — Revenue and commercial structure
The first meeting took place at the client’s offices the next morning. Their management team outlined current development capacity, existing customer commitments and the kinds of work they hoped the relationship would generate. Half Assed presented three possible revenue streams: subcontracted implementation, jointly delivered projects and reciprocal introductions where one party was better placed to lead an engagement.
The subcontract model was the simplest to describe. Half Assed would retain the client contract and commission defined packages of work from the Wuhan team. The principal questions concerned how much specification would be required before a fixed price could be agreed, who would absorb revisions and how acceptance would be recorded.
Joint delivery offered a larger potential return to both parties but required more agreement about account ownership and responsibility. The commercial lead distinguished gross contract value from the margin available after discovery, project management, engineering, quality assurance and post-launch support. The partner wanted assurance that reserved staff would receive a reasonably consistent volume of work; Half Assed could provide an opportunity forecast but could not guarantee that every prospect would become a signed project.
Referral work was discussed separately. Both sides were receptive to introducing suitable clients, but neither wanted a referral percentage to apply indefinitely to unrelated work won later. The meeting produced several possible structures rather than a preferred agreement.
27 December — Delivery economics
The afternoon session compared the cost of individual engineering days with the cost of delivering an accepted piece of work. The partner’s indicative rates were attractive, particularly where a project required several developers for a sustained period. Half Assed’s estimates, however, needed to include specification time, review, coordination and client communication in London.
A sample website project was worked through from discovery to support. The parties considered what happened if the client delayed content, changed a workflow after implementation or disputed whether a defect was a new requirement. They also discussed whether engineering capacity would be sold as named people, a monthly allocation or a committed outcome.
The technical lead noted that the time difference could support a useful daily handover, provided the work was ready to proceed without continuous clarification. It would be less useful if every question waited until the following overlap period. The resulting cost model therefore included documentation, a regular shared meeting and an identified technical contact on each side.
No final rate card was signed. Both parties agreed to revise their figures after the technical sessions had established how much shared process would be necessary.
28 December — Systems integration
The second day focused on how the two teams would actually work together. Half Assed used separate repositories, issue tracking, deployment controls and a support queue. The partner had comparable tools but different conventions for release numbering, issue ownership and the point at which work was considered complete.
The proposed starting point was one shared project workspace rather than a direct connection between the companies’ entire internal environments. Requirements and acceptance criteria would be recorded in a common backlog. Engineering changes would pass through reviewed branches, with a named reviewer on each side for work affecting customer-facing behaviour.
Builds would run in a controlled integration environment using agreed runtime versions and dependency files. A successful build would produce a versioned artefact for testing, and production deployment would remain with the party responsible for the client’s hosting contract. The partner asked for enough access to investigate failed builds without having to request every log extract from London.
The teams also considered an interface between their project and support systems. An initial JSON-based exchange could carry project identifiers, issue references, status changes and approved time entries. Customer credentials, internal commercial notes and unrelated account records would remain outside that exchange.
These were design discussions, not a live integration exercise. The technical leads demonstrated sample workflows and compared data fields, but no link between production systems was enabled during the visit.
28 December — Engineering capacity
The client introduced members of its development and testing teams and described the skills available through its wider technical labour pool. The discussion covered PHP application work, JavaScript interfaces, database development, test automation and ongoing maintenance of older systems.
Half Assed was particularly interested in being able to add capacity for implementation without rebuilding a team for each contract. The partner explained that this depended on notice, the requested skill mix and whether the same people would be required throughout a project. Availability for one framework did not imply that every engineer could be reassigned immediately to another.
The technical lead proposed beginning with a small, clearly bounded delivery package. This would allow both organisations to assess specification quality, code review, communication and defect handling before making a broader staffing commitment. The client preferred a pilot large enough to justify assigning a consistent team.
After the afternoon session, the hosts accompanied the visitors on a walk along the riverfront and through central shopping streets. Dinner continued the conversation about how decisions would be made when a project involved managers in both offices.
29 December — Operating model and outstanding points
The third day returned to the commercial assumptions with the technical findings available. There was general agreement that a partnership could work, but less agreement about the amount of capacity Half Assed should reserve before it had committed client revenue.
The partner wanted a minimum allocation to cover the cost of keeping suitable engineers available. Half Assed preferred to place work against individual client orders and increase the commitment after a successful pilot. Both positions were understandable, but the gap was material to the proposed margins.
Other open points included currency exposure, payment stages, warranty effort, the handling of client changes and whether support outside the normal working day would be included in the development rate. The technical teams also needed to agree who would maintain shared tooling and how a departing engineer’s access would be removed from both organisations’ project spaces.
The meeting ended amicably. The parties agreed to exchange revised commercial schedules, identify a candidate pilot and arrange a further call once those documents had been reviewed. There was no signed partnership contract, no reserved engineering team and no confirmed date for the first joint project.
The remaining time included visits to East Lake and the Yellow Crane Tower, with meals and local transport arranged by the hosts. The visitors thanked the client for the programme and confirmed that the trip had been useful even though the commercial outcome remained open.
30 December — Return to London
The Half Assed team checked out of the hotel and travelled to the airport for the return journey. Their notes separated agreed principles from proposals which still required approval, and the technical lead consolidated the workflow diagrams for circulation after the holiday period.
After landing in London, both personnel reported bad colds and signed off sick. Their immediate administrative work was reassigned, including sending the meeting notes and acknowledging the partner’s follow-up email.
Staff absence and return to work
Both attendees sought medical advice and were advised to rest. One remained at home. The other decided that he felt well enough to go out and spent part of his absence travelling around London, completing errands, meeting friends and visiting people he had not seen before the trip.
They subsequently returned to work and resumed their ordinary project allocations. The absence was recorded as sickness, and the commercial lead circulated the revised action list from the Wuhan meetings. The proposed partnership remained under discussion while both sides considered the minimum commitment and pilot arrangements.
During the return-to-work review, the colleague who had travelled around London reported that several friends had subsequently developed similar symptoms. He considered transmission during those visits likely. Remaining at home during future sickness absence was recorded as the agreed corrective action.