Field report: wildlife telemetry deployment

POSTED: 02.09.2016AUTHOR: ADMIN9 MIN READCOMMENTS: 0

Design, commissioning and field support of a wildlife telemetry system for a reserve-based research programme, including animal-mounted tags, receiving stations and a movement reporting portal.

April–July 2016 — Specification and development

The client was studying movement between grazing areas and water sources on a southern African reserve. Its existing survey combined direct observation with manually downloaded tracking records. HAWD was commissioned to design a set of monitoring tags that would collect position and activity data and upload stored observations when animals passed within range of the reserve’s receiving stations.

The specification covered 24 devices, a base-station network and a browser interface for researchers. Each tag incorporated a GPS receiver, motion sensor, local storage and a low-power radio. HAWD designed the circuit boards, firmware and sealed enclosures. The field biology team specified attachment arrangements for the selected species and retained responsibility for initial fitting and animal records.

The reporting interface showed the age of each position, battery status and the extent of gaps in a track. Researchers requested exports that preserved the distinction between an observation’s timestamp and the time it reached the server. HAWD added a review queue for incomplete records and a separate view for maintenance staff to identify devices requiring attention.

Bench testing covered position acquisition, interrupted radio coverage, battery replacement and upload of stored observations. Enclosure samples underwent water and dust testing. The researchers then compared tracks collected on reserve vehicles with recorded survey routes. Following interface revisions, the team approved the tag register, export format and daily reporting workflow.

12 August — Field commissioning

The biology team fitted the devices during its scheduled animal examinations. HAWD engineers attended to register each unit, confirm reception and associate its identifier with the correct animal record. The deployment included springbok, warthogs, zebras, baboons and an adult male ostrich fitted with a leg-mounted unit.

Receiving stations were commissioned at the field office and established observation points. The client checked the first movement records against sightings, completed a reporting exercise and signed off the installation. HAWD supplied spare tags, configuration records and instructions for returning a device for examination.

FIELD ACCEPTANCE

Twenty-four tags entered service following fitting by the biology team and verification of the receiving stations and reporting portal. The client accepted the initial observations and completed staff training on 12 August 2016.

16 August — Conflicting observations

A researcher reported that three animals had apparently remained at the same water point overnight, although the morning survey located them elsewhere. Further checks found devices reporting falling battery levels, repeated startup messages and periods of no reception. Eight units were removed from the research dataset pending investigation.

HAWD reproduced part of the behaviour on a retained sample. Following an unsuccessful transmission, the firmware sometimes remained in its retry state instead of returning to sleep. A subsequent restart could also label the last stored position with the current time. The receiver therefore accepted an old location as a new observation while the device consumed its battery attempting further transmissions.

A revised firmware build passed an extended interrupted-coverage test. The affected units required a wired update, and HAWD proposed replacing them with prepared spares so that the original hardware could be examined without further delay to the study.

Field attendance arrangements

The biology team had departed for an island census under a separate research contract. Rough weather had suspended its return boat service, and the next available animal-handling contractor could not attend for ten days. Telephone contact with the team was intermittent.

HAWD dispatched two engineers with the replacement units, a field laptop and the maintenance register. The reserve supplied a driver and access to its handling facilities. The engineers were briefed remotely on the tag identifiers and attachment types. The visit was booked as a three-day hardware exchange.

22–23 August — Initial replacements

Two springbok were brought through an existing handling race with reserve staff. The first tag was exchanged and verified at the field station. During the second exchange, an engineer dropped the service laptop when the animal moved against the gate. The screen hinge failed, but the replacement tag was registered using the spare computer.

One warthog entered the holding area and remained there while its unit was exchanged. The second passed beneath a temporary side panel before the gate was secured. An engineer followed with the equipment case and returned without one boot after the animal turned back along the same route. The tag was replaced later that afternoon in a different enclosure. The side panel required new fixings.

The zebra exchange was completed at the reserve’s stock-handling facility. During unloading, the animal struck the vehicle door and folded it against the front wing. The device was recovered, but the passenger door could no longer be closed and the vehicle was withdrawn from use.

Two baboon units were exchanged over separate visits. During the second visit, another animal took an open case containing three unused replacement tags and carried it onto the field-office roof. It removed the foam inserts and dropped the case into a water tank. Staff recovered the equipment after draining the tank; one spare could no longer be read.

Seven of the eight affected tags had now been replaced. The remaining unit was attached to the ostrich. The engineers located the bird on open ground near a service track, but it moved away whenever they approached within working distance.

24 August, 08:10 — Temporary holding pen

The first attempt used portable panels to form a holding pen beside an established feeding point. A remotely operated gate was added so that the engineers could remain out of sight. The ostrich approached the entrance, reached the feed through a gap between the panels and remained outside.

An engineer entered the pen to move the feed. His passage triggered the gate sensor, closing the entrance behind him. While the other engineer attempted to release it from the laptop, the bird pushed against an unbraced side panel. The panel fell across the gate, preventing it from opening. The engineer was released after the reserve driver removed two sections of the pen.

24 August, 11:40 — Suspended net

A second arrangement suspended a capture net from a temporary frame above the approach to the feeding point. The release mechanism operated correctly during an empty trial. During the occupied trial, the ostrich stopped short of the marked area while the engineer moved forward to adjust the receiver.

The net released onto the engineer and drew part of the frame towards the ground. One support struck the parked vehicle’s windscreen. The bird moved around the fallen frame and continued towards the water point. The road runner tag remained outstanding on the afternoon exchange sheet.

24 August, 13:30 — Pressure-pad enclosure

The next attempt used a suspended drop cage with a pressure pad beneath the feeding area. The ostrich walked across the pad, stopped to feed and left without activating the release. A second passage produced the same result. The control unit continued to show the system as armed.

An engineer entered the drop area to inspect the pad. The cage released without a command from the operator and enclosed him before he reached the sensor housing. The event log recorded a pressure input at the time of release, although the engineer had not yet stepped onto the pad.

The manual lifting arrangement could not be reached from inside the cage. The second engineer and the reserve driver raised one side sufficiently for him to leave. The ostrich remained outside the enclosure. The release circuit was disconnected and the arrangement was withdrawn from use.

24 August, 15:20 — Mobile feed station

The engineers mounted a feed hopper on a remotely controlled maintenance trolley, intending to lead the bird into the reserve’s fixed handling enclosure. The ostrich followed for approximately 30 metres, then stopped. The trolley continued through the enclosure and failed to respond to the stop command.

It crossed the service yard and entered the stores building through the lower section of a closed timber door. The hopper detached and discharged its contents across the floor. The controller log ended before the impact. Retrieval of the trolley and removal of spilled feed occupied the remainder of the afternoon.

25 August, 07:50 — Vehicle-assisted approach

The following morning, the engineers attempted to approach alongside the bird using a utility vehicle carrying an extended net frame. The ostrich changed direction before the vehicle reached it. The driver followed the turn and entered a dry drainage channel obscured by grass.

The front axle came to rest across the channel, leaving the rear wheels without sufficient traction to reverse. The net frame detached and fell over the passenger compartment. Recovery required a tractor from the neighbouring property. The ostrich remained visible throughout most of the recovery operation.

25 August, 13:15 — Concealed observation position

The final attempt used a wheeled observation hide positioned beside the feeding area. The engineers fitted a hinged net frame to its front opening and waited inside for the bird to approach. The ostrich inspected the hide from behind and began pulling at a loose section of its covering.

One engineer moved to the rear to secure the fabric. The shift in load moved the hide off its wheel chocks and onto the slope leading to the service yard. It rolled downhill with both engineers inside, crossed the track and came to rest near the recovery vehicle in the car park.

Both engineers left the hide. One briefly entered the recovery vehicle and prepared to drive it, adjusting the parking brake before getting out again to assist his colleague. The other engineer kicked the side of the hide. The net frame then deployed, catching both engineers and grazing the side of the recovery vehicle. Part of the net became caught around the vehicle’s rear step.

The recovery vehicle began rolling slowly forwards. As the net tightened, it pulled the hide off its resting position and dragged both engineers with it. The vehicle continued beyond the edge of the car park and entered a drainage ditch, bringing the hide, net and engineers down behind it.

The reserve driver found the vehicle in the ditch with both engineers entangled between the net and the overturned hide. He cut the net to free them and assisted them out of the ditch. One engineer subsequently received treatment for a wrist injury and abrasions; the other was treated for bruising and a shoulder injury. The recovery vehicle required a separate recovery operation.

The ostrich had returned to the feeding area. HAWD terminated further capture attempts and marked the remaining hardware exchange as incomplete.

2 September — Service position

The seven replacement tags were transmitting usable observations. Records from the affected period remained excluded where their original observation times could not be established. The ostrich’s unit had stopped reporting, and its replacement was deferred to a future visit by the field biology team.

The reserve submitted a schedule covering damage to two vehicles, the stores door, portable panels and handling equipment. HAWD’s field inventory recorded one damaged laptop, one failed spare tag and loss of the trolley controller log. The original three-day visit had extended to five days, including vehicle recovery and clearance of the temporary installations.

The client declined to approve the field-attendance charges pending review of the additional work. HAWD referred the property-damage schedule to its insurers and retained the recovered tags for analysis. No further engineer-led retrieval visits were scheduled.

MAINTENANCE OUTCOME

Seven faulty tags were replaced and returned to service. The ostrich’s tag remains unrecovered, and its observations are unavailable. Further retrieval work has been deferred to the biology team. Equipment damage, vehicle repairs and the disputed attendance charges remain under review.